|
2.8 Place the rubber pad between the wall and the top beam (you will have to cut holes in the rubber pad for the studding), square up and plumb the top guides. Adjust the top beam position as required and tighten screws.
2.9 Square up and plumb the lower guides. Fix the base plate onto the floor. Cut the carpet and underlay around the lower guides and the ram cup.
|
|