1.1 On arriving at the site, the installer should make his presence known to the customer. The installer must comply with any Site Safety Procedures and Regulations that are in force. 1.2 Before commencing the installation, it is important to ensure that the interfloor aperture and power supply have been fitted according to the requirements of the builder's work and electrical schedule. It is important to check that:
i. The relative positions of the interfloor aperture, power supply and route to the power cabinet accord to the site plan. ii. An adequately clear working area, free from carpets and furniture, has been provided in both rooms in which the lift will travel.
iii. Piping or cables not related to the lift installation have been adequately re-routed away from the lift path. iv. Any alterations required to free the passage of the lift from obstructions such as coving or dado rail have been made. v. The steel fire resistant hoop has been correctly installed into the interfloor aperture.
vi All decor disturbed during the building work has been adequately made good.
vii. A dedicated single phase 240v power supply, terminating in a 10 amp switched fuse spur unit, has been provided.
viii. All lift parts have been received and are not damaged.
1.3 All carpet area, walkways and any remaining furniture in the vicinity of the lift is to be protected with dust sheets. Avoid undue disruption.
|
|