|
On completion of the installation the lift is ready to be tested. The test must be carried out according to the, 'BS 5900 Homelift Certificate of Test and Examination After Installation'. The lift can only be commissioned once this has been correctly completed.
Before handing the lift over to the customer, ensure the work place is tidy, and the lift is clean.
When handing the lift over to the customer or the person responsible for the lift, the following must be demonstrated to him/her:
i. Full operation of the lift controls.
ii. The position and operation of all safety edges and surfaces.
iii. The lift manual lowering procedure and the passenger release procedure.
iv. That the customer is aware of who the contact in case of a break down.
Before leaving the site you must ensure the customer has run through a complete operation and is completely satisfied with the product.
|
|